CITAGLOBAL LAND SDN BHD

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages.

Corporate Information

Our Expertise

Civil Engineering & Construction

Current Selected Projects

CITAGLOBAL LAND SDN BHD – Final

The Construction and Completion of Part of West Coast Expressway Section 9 Mainline Works from Kg. Lekir Interchange to Changkat Cermin Interchange

Contract Duration : 40 Months

Client : West Coast Expressway Sdn Bhd

Main Contractor : IJM Construction Sdn Bhd

The project is Section 9 of West Coast Expressway, which is from Kg. Lekir Interchange to Changkat Cermin Interchange. The 30km of 2-lane dual carriageway consisting of 4 interchanges, 13 ROB (Road Over Bridge) and 6 RUB (Road Under Bridge).

CITAGLOBAL LAND SDN BHD – Final

Design, Construction, Supply, Installation, Completion, Testing, Commissioning And Maintenance Of The Electrified Double Track From Gemas To Johor Bahru Bridge Works For Section 2 – Genuang To Paloh (CH605.550 – CH647.900)

Contract Duration : 30 Months

Client : West Coast Expressway Sdn Bhd

Main Contractor : Q Bena – Prisma Simfoni JV

This project consists of the construction of 20km of West Coast Expressway, which is from Changkat Cermin Interchange to Beruas Interchange. The project involved 3.20 million cubic meters earthworks and 5 bridges.

CITAGLOBAL LAND SDN BHD – Final

Design, Construction, Supply, Installation, Completion, Testing, Commissioning And Maintenance Of The Electrified Double Track From Gemas To Johor Bahru Bridge Works For Section 2 – Genuang To Paloh (CH605.550 – CH647.900)

Contract Duration : 17 Months

Client : Keretapi Tanah Melayu Berhad

Main Contractor : Syarikat PembInaan Yeoh Tiong Lay Sdn Bhd

The scope of work involves the construction of 18 structures from substructure to super- structure. Out of the 18 structures, 17 are bridges, which consist of 10 river bridges (BRV), 6 road over bridges (ROB), 1 road under bridge (RUB) and 1 vehicular box culvert. The structures are located in different locations from North to South approximately 40km

CITAGLOBAL LAND SDN BHD – Final

Duta-Ulu Kelang Expressway (DUKE) Phase 2, Section 1 – Sri Damansara Link The Construction and Completion of Bridge Structure for Mainline 1 (ML1-Pier 1 to Pier 45, Ramp 1 & Ramp 2 – RP2/6 to RP2/15) & (ML1- Pier 46 to Pier 82 & Ramp 2-RP2/1 to RP2/5H

Contract Awarded : 2017

Client : Konsortium Lebuhraya Utara-Timur (KL) Sdn Bhd

Main Contractor : Pembinaan Sahabatjaya Sdn Bhd

The project is part of the extension of Sri Damansara Link of DUKE Phase 2. The package is approximately 3km elevated viaduct of dual-carriageway over the existing Jalan Taman Bukit Maluri. The scope of work includes construction of pile caps, piers, casting and launching of prestressed T-beam and segmental crosshead up to deck slab.

CITAGLOBAL LAND SDN BHD – Final

Second Penang Bridge Land Expressway Package 2A Projek Menaiktaraf Bayan Lepas Expressway Dari Batu Maung ke Jambatan Kedua Pulau Pinang

Contract Awarded : 2016

Client : JKR Malaysia

Main Contractor : UEM Construction Sdn Bhd

This project involved construction of 3km bridge over the existing Bayan Lepas Expressway in Batu Maung, Penang. The main span crossing river consists of in-situ balanced-cantilever box girder with span configuration of 107+170+107m, constructed using form traveler above live traffic.

CITAGLOBAL LAND SDN BHD – Final

Cadangan Pembangunan 2 Blok Kondominium 38 Tingkat Dan 39 Tingkat (534 Unit) Yang Mengandungi 3 Tingkat Podium Tempat Letak Kereta Dan 2 Tingkat Besmen Tempat Letak Kereta Di Atas Lot PT26199 (Lot Asal 1891 & 1892), Jalan Kiara 3 Dan Jalan Kiara 4, Mont’ Kiara, Mukim Batu, Wilayah Persekutuan, Kuala Lumpur

Contract Awarded : 2015

Client : JKR Malaysia

Main Contractor : Aston Star Sdn Bhd & Sunrise Pioneer Sdn Bhd

This project involved construction of basement for MK22 Condominium. Scope of works included earthworks to form a 10m deep basement, jack-in spun pile and retaining wall.